| 1. | Standard practice for installing factory - made corrugated aluminum culverts and storm sewer pipe 工厂制波纹铝涵管和雨水管安装的标准实施规程 |
| 2. | Standard practice for least cost life cycle analysis of concrete culvert , storm sewer , and sanitary sewer systems 混凝土涵洞,雨水沟,排污沟系统的最低成本 |
| 3. | Standard practice for life - cycle cost analysis of corrugated metal pipe used for culverts , storm sewers , and other buried conduits 涵洞雨水管道和其它地下管道用波纹形金属管寿命周期成本分析的标准实施规范 |
| 4. | Standard specification for composite ribbed steel pipe , precoated and polyethylene lined for gravity flow sanitary sewers , storm sewers , and other special applications 预涂覆和聚乙烯复合肋式钢管标准规范 |
| 5. | Standard specification for storm drain resilient connectors between reinforced concrete storm sewer structures , pipes , and laterals 加筋混凝土暴雨排水沟设施管道和横向排水沟间的排水沟回弹性连接件的标准规范 |
| 6. | Standard practice for structural design of corrugated aluminum pipe , pipe - arches , and arches for culverts , storm sewers , and other buried conduits 涵洞排水和其它地下管道用波纹铝管管拱和拱结构设计的标准实施规程 |
| 7. | Standard specification for storm drain resilient connectors between reinforced concrete storm sewer structures , pipes , and laterals metric 加筋混凝土排暴雨污水结构管道和横向排水沟间的暴雨排水沟弹性连接件标准规范 |
| 8. | Standard specification for 12 to 60 in . 300 to 1500 mm annular corrugated profile - wall polyethylene pipe and fittings for gravity - flow storm sewer and subsurface drainage applications 自流式雨水管和地下排水装置用12至60英寸300 to 1500 mm环形波纹状异型壁聚乙烯管和配件的标准规范 |
| 9. | This paper creatively introduce fractal theory into the study of municipal networks ( include pipe networks , sewer networks and storm sewer networks ) , analyze their fractal character and explain their physical mechanism , which is the origin of the fractal structure 本文以市政管网(包括供水、污水和雨水管网)作为研究对象,创造性的引入分形理论,分析论证了管网的分形特性及其形成的物理机制。 |
| 10. | On the basis of actural engineering projects , discussion is presented of some problems in the design of storm sewer system , such as the decision of design parameters for rainfall reappearing periods and closure multiples , the determination of water - collecting positions , the connecting methods of intercepting storm - sewage system with intercepting main pipes and he calculation of flow capacity of overflow traps 摘要结合工程实际对雨水管渠设计中的设计重现期、截流倍数等设计参数的选择、雨水集水点位置的确定、截流式合流制管渠与截流干管的连接方法以及溢流井溢流量的计算等问题进行了探讨。 |